INSTRUCTION MANUAL
When to use:
page up to 6 inches = 1 inch
page up to 12 inches = 1.5 inch
page up to 18 inches = 2 inch
page over 18 inches = 2.5 inch
1 inch
1.5 inch
2 inch
2.5 inch
1 inch
1.5 inch
2 inch
2.5 inch
TAMKO red is PMS 185,
which according to the
logo standards breaks
down to be M100, Y80
All logos are cmyk
If needed, TAMKO red is PMS185
®
®
Vista de página 0
1 2 3 4 5 6 ... 11 12

Resumo do Conteúdo

Página 1 - INSTRUCTION MANUAL

INSTRUCTION MANUALWhen to use:page up to 6 inches = 1 inchpage up to 12 inches = 1.5 inchpage up to 18 inches = 2 inchpage over 18 inches = 2.5 inch1

Página 2 - MEASURE SPAN BETWEEN POSTS:

4.25" MIN.4.25" MIN. INSTALLATION STEPS:1 Assemble the concrete surface plate to the bottom of the post mount member as shown using fou

Página 3 - 1-5/8" MINIMUM DISTANCE

Post MoUnt installation CONCRETE APPLICATION (continued)Fig. 4Fig. 5121314153/8" STAINLESS STEEL HEX NUT3/8" STAINLESS STEEL WASHER3/8"

Página 4 - (Continued)

It is the responsibility of the installer to meet all building code and safety requirements and to obtain all required building permits. For Marquee R

Página 5 - FIGURE 2

BEFORE YOU BEGIN:IMPORTANT PRODUCT SAFETY AND PRE-INSTALLATION INFORMATIONFAILURE TO FOLLOW THESE INSTRUCTIONS MAY LEAD TO AN UNSAFELY INSTALLED PRODU

Página 6 - INSTALLATION STEPS:

2FIGURE 1FIGURE 2 INSTALLATION STEPS:1 Install and prepare posts or other mounting surfaces for Marquee™ Railing installation. Ensure mounting su

Página 7 - FIGURE 4

FIGURE 5FIGURE 6FIGURE 7FIGURE 8Attach the crush block included with the Marquee Rail Kit on the underside of the bottom rail using the screw provide

Página 8 - MOUNT - FIGURE 2

FIGURE 1FIGURE 2Fig. 1Fig. 24123Follow steps 1 and 2 of the Straight Rail Installation Instructions on page 2 to prepare the area for installation.Mar

Página 9 - (See Fig. 4 for more details)

INSTALLATION STEPS:1 Install and prepare posts or other mounting surfaces for Marquee™ Railing installation. Ensure mounting surfaces are level

Página 10 - 1" LEVELING BOLT

101112FIGURE 5B4 Set the bottom rail to the side. Position the bracket at marked location and secure using two of the screws provided in the Marq

Página 11 - THE POST MEMBER

Marquee™ Wood/Composite Post Mount Kit 5" x 5" x 38" for use with all Marquee 6' and 8' Railing Kits at 36" Rail Hei

Página 12

Marquee™ Concrete Post Mount Kit 5" x 5" x 38" for use with all Marquee 6' Railing Kits in 36" Rail Heights Marquee Conc